03104263500 | 03104263501

Job Detail

  • Home
  • Jobs
  • Assistant Line Superintendent (BPS-15)

Assistant Line Superintendent (BPS-15)

Start Date: 2024-09-24 Last Date: 2024-10-18 Expired Job Entry Test Fee: 1050. PKR
How To Apply? Can't Apply

Organization

Pakistan Electric Power Company (PEPCO)

https://oreapak.com

Overview

Pakistan Electric Power Company (PEPCO) was established in 1998 for implementation of the Strategic Plan for Privatization of Power Wing of WAPDA, approved by the Council of Common Interest (CCI) in 1993. It was decided that WAPDA’s Power utility functions be separated and the Power Wing be unbundled and corporatized into DISCOs, GENCOs, and the NTDC.

Job Details :
Full Time Male Morning Salary: 23920.00 - 83320.00 Education: DAE 3 Years (in any discipline) Experience: N/A years Phone: 03104263501 Location: Throughout Pakistan Email: support@oreapak.com
Job Description :

The role of Assistant Line Superintendent at PEPCO (Pakistan Electric Power Company) involves supporting the Line Superintendent in managing the installation, maintenance, and repair of electrical distribution lines and equipment. This position is crucial for ensuring the efficient operation and reliability of the power distribution network. Below are the typical criteria and responsibilities for the role of Assistant Line Superintendent at PEPCO:

 

Job Designation

Assistant Line Superintendent

BPS

15

Provincial Job Quota

Punjab (32) Sindh (19) KPK (22) Baluchistan (14)

Provincial Job Quota Status

Open Merit

Mandatory Qualification

DAE 3 Years (in any discipline)

Professional Certification/Course

Fresh (Experience will be preferred)

Eligible Gender for this Job

Male

Age

18-36 Years (Five Years Age Relaxation Included)

Place of Posting

Throughout Pakistan

Last Date to Apply

16 October 2024

 

Responsibilities under Desired Job

 

Support to Line Superintendent:

Assist the Line Superintendent in overseeing and managing the operations of electrical lines, including installation, maintenance, and repair activities.

Provide support in planning and coordinating field operations, ensuring tasks are completed efficiently and safely.

Supervision of Field Teams:

Supervise and direct line crews and technical staff involved in electrical line work.

Assign tasks, monitor progress, and ensure that work is carried out according to PEPCO’s standards and safety protocols.

Provide on-the-job training and support to team members as needed.

Maintenance and Repair:

Assist in the routine maintenance and repair of power lines, transformers, and other electrical equipment.

Conduct inspections and identify issues with electrical lines, ensuring timely resolution of faults and minimizing downtime.

Safety Compliance:

Enforce adherence to safety standards and procedures during all field operations.

Ensure that all team members use appropriate personal protective equipment (PPE) and follow safety protocols.

Conduct regular safety inspections and risk assessments to identify and mitigate potential hazards.

Field Operations:

Participate in the installation, testing, and commissioning of new electrical lines and infrastructure.

Assist in responding to emergencies, such as power outages or faults, and implement corrective actions as needed.

Documentation and Reporting:

Maintain accurate records of field activities, including installation, maintenance, and repair work.

Prepare and submit reports on operational status, work completed, and any issues encountered to the Line Superintendent.

Ensure proper documentation of all work performed and materials used.

Customer Service:

Address customer complaints and concerns related to power supply issues, outages, and service quality.

Assist in providing technical support to customers when required and ensure timely resolution of their issues.

Coordination with Other Departments:

Coordinate with other departments, such as planning and engineering, to ensure alignment of field operations with overall project goals and schedules.

Work with supply chain and procurement teams to ensure the availability of materials and equipment needed for fieldwork.

Project Execution:

Assist in the execution of small to medium-scale projects related to electrical line installation and maintenance.

Ensure projects are completed on time and in accordance with required quality standards.

Emergency Response:

Respond to and manage emergency situations, such as outages or faults, ensuring quick restoration of power and minimal disruption.

Coordinate emergency repair efforts and manage resources effectively to address urgent issues.

Key Competencies:

Technical Proficiency: Solid knowledge of electrical line systems and maintenance procedures.

Leadership: Ability to supervise and guide field teams effectively.

Communication: Effective communication skills for reporting and customer interaction.

Safety: Commitment to enforcing and adhering to safety standards.

Problem-Solving: Capability to address and resolve technical issues efficiently.

 

General Terms and Conditions

 

These contract positions offer competitive remuneration. Male, Female, and Transgender applicants from the listed provinces can apply. Candidates can apply for multiple positions by paying separate fees. Appointments will be made through oRea-Pakistan's Screening Test under the Recruitment Policy 2022. Age is calculated as of the application deadline, with a 5-year upper age limit relaxation per Service Rules. Government employees should apply through proper channels. No TA/DA for tests or interviews.

 

Procedure for Submission of Application Form

 

Apply online at www.oreapak.com. Pay the test fee using the 18-digit invoice number via Bank ATM, Internet/Mobile Banking, Easypaisa, Jazzcash, or TCS Express. Only 1Bill payments accepted. Incomplete or late applications won't be considered. Test dates will be notified to shortlisted candidates via oRea-Pakistan. A minimum of 50% marks in the test is required to qualify. The appointing authority may set a higher threshold if needed.

 

The Assistant Line Superintendent at PEPCO plays a vital role in supporting the Line Superintendent and ensuring the smooth operation of electrical line maintenance and repair activities. This position requires a combination of technical expertise, supervisory skills, and a strong focus on safety and quality.

Ad Broucher
(Click image to see preview.)
Job Entry Test Fee: 1050 PKR
Can't Apply
How To Apply?